Tuesday, June 23, 2009
The house had been cleaned with the floors washed and the carpets steam cleaned as requested (they were still damp when we went through). Our meeting started with the SS taking it very casually as though we were just going to walk through and say "this is great". After pointing out a few things, he decided he might need a notebook and proceeded to note our concerns. He agreed with most of what we pointed out and noted everything that needed fixing which I was very pleased with.
At the time we went through there were still a few things unfinished - the garage doors and driveway (still!) and the laundry tub and a few power points as well.
So what did we pick up on? Here are just a few things...
...the grouting of all the tiling, except the main living area floor, is appalling and even the SS called it "unacceptable". There is grout all over the tiles and the grout lines in many places are higher than the tiles on either side. I can't beleive that anyone could leave a job in this state and think that it was finished!
...The tiles are uneven in the ensuite. There is a visible difference between the top of the feature tile and the top of the rows on either side (and it's the first thing that you see when you walk into the ensuite)
...There is also a visible difference in the feature tile on the bath as well - the feature is at least half a centimetre deeper than the surrounding tiles (they are not at all flush as you pass your hand over them)
...The garage is a shocking job - above the main opening the inside section is a mess where there are cracked plaster sheets where the plasterer has forced the sheet down over a peice of timber that should have been trimmed first (it would have fit then!) and all of the nails holding it in place have popped already. Hard to explain but suffice to say its the result of laziness! There is also several other sections where the edges haven't been finished or sealed and the access door is as rough as it can get.
...The lounge room window has a gap that you can fit your hand into (on the outside) between the frame and the bricks - you can even see the timber frame of the house through it
...The exhaust fans/heat lights that we upgraded to in both bathrooms have been left off and instead have only a single batten light fitting.
...There's a power point missing in the hall and the ones in the lounge still haven't been corrected (and they are at the wrong height)
...The external lights that should be sensor lights are missing their sensors
...The plaster in one room needs the lower sheets from 3 walls to be replaced as they have ripples in them (someone had already marked "damaged" on these walls and then dropped the black pen they were using on the carpet leaving a black mark!! The SS tried to rub it off but I told him I wasn't happy with that! as I said "rubbing it in isn't getting the mark out!!!" )
...There are other things that OH has picked up and we still need to get our inspector to take a look. Again the SS questioned us about "why" we felt it was necessary, claiming that he was just trying to "save us money". My reply was simple... "we want to know that the house is structurally sound... he picked up things in the first inspection and we need to know that those have been corrected and that no other mistakes have been made since". SS tried to tell us that we'd already had him check the structure and that those things have been fixed so there's no need. We won't be swayed however and are booking the inspector anyway!!
SS has asked for a week to fix up the stuff that we've pointed out before we bring in our inspector. Then there will no doubt be more to fix (which they should do in 2 weeks unless it's something major). The SS is also taking a week off next weeks So I expect that we are still at least 3 weeks off handover (more likely more!).
No problem though - we're booking the fencer to start next week regardless. The verandah will be started soon and I'm also in the process of lining up the concreter. We may have all of this done before we move in at this rate!!
Thursday, June 18, 2009
Initial inspection tomorrow!!
I'm not sure if this means that the garage doors and driveway have been done yet - we'll see tomorrow. At least it means that we'll have a chance to find out about some of the issues that we've identified so far.
Lonely...
Monday, June 15, 2009
No PCI today...
We dropped by on Sunday afternoon and peered through the windows to find that the painting has finally been finished!! The doors and door handles on all the rooms and robes have now been installed and the tiling in the kitchen has been finished - can't say about the bathrooms because of the obscure glass that we opted for. As far as we could see there is still some electrical fit-off work to be done, the laundry tubs still needs to be installed, the down-pipes painted, and of course the garage doors and driveways.
As we walked around there were few things that didn't seem quite right but I need to check the contract to make sure - power points that are doubles instead of quads, external lights without sensors etc...
It's all looking good though (despite the fact that we've both decided that we don't like the paint colour that we've chosen) and should be ready soon. So we've started booking appointments for quotes on fencing, verandah and concreting. I've also tentatively booked the independent inspector in anticipation of a PCI in the next 2-3 weeks.
Tuesday, June 2, 2009
The end is near!!!!!!!
Our CSO will confirm this with us tomorrow but it's nice to know we're not far off. After the PCI they have about 2 weeks to fix any problems which means we should have our keys by the end of the month or the first week in July. Of course this is all dependant upon the SS and relevant tradies getting the job done and on the bank getting the evaluation and processing the payment so anything is possible!
Maybe NOW it's time to start packing....
Monday, June 1, 2009
Weekend report!!
I've spoken with our SS today and he told me that:
- The tiling should have been finished on the weekend
- The painter should have finished on the weekend
- The carpet was due to be laid today
He's not certain that any of it has been done yet but I've got an appointment to meet him on-site on Thursday so I will find out then. Still no word on when we're looking at handover (our SS is a man of few words), but given that the carpet is going in today and they keep telling us that carpets will be last, we can't be far off.
Our weekend was also a productive one - we only hope that they were as productive over at the house.
We managed to achieve a couple of things...
1. We purchased fabric for the remaining curtains. We've chosen a reddish fabric that is the same type as the green one that we have for the kitchen/living room. It's called Tobasco and is an dusty-orangey-red (not as bright as it looks in the photos - although that's the colour I would have preferred). This will also be made into Roman blinds.... soon I hope! I still have to remember the tape-measure for Thursday's meeting so that I can measure up and get started!
2. I did some reading on how to make the Roman blinds and now have a fair idea of how they're made/assessbled and am not at all scared by them anymore. My only real concerns are a) that I have enough fabric and b) that I get the rod pockets straight so that they don't look "home made".
3. We decided on a landscaping plan - and we both agree on it! This is pretty exciting as all along it seems that we've had different ideas/thoughts about what would work and what we prefer. Somehow we've managed to incorporate both of our 'wants' in a way that works both for the house and for us!! I can't wait to see it come together now! 3
We've decided on Conifers in the front yard with a couple of hardier maples for the autumn colour (and to meet the developers guidelines). We're going to put pencil pines out the back around the fence-line and we'll have a native garden outside the loungeroom window. There will also be a paved patio with a pergola. Now we just need to work out what this is all going to cost and which bits we can do ourselves and which bits we'll contract out...
4. We started buying plants... I've been reluctant to buy any plants until we knew what it was that we were going to do - I didn't want to end up with plants that didn't work with our final plan. Not that we're going to buy too many more before we move or get the keys but...
I took a drive up to the Dandenongs to visit the conifer gardens and seeing that I'd made the trip, decided to buy a few. I was a bit reluctant about conifers until I visited this nursery - it is amazing. If you think that conifers are just pencil pines and book leaf pines, take a look at this place and you'll discover that there's so much more to it!!!
Whilst up there I also found a nursery that had a heap of specials on the natives that I love and so had to buy a few of them too. Now we just need to hope that we're not too far off on hand-over.
We also found the maple that we want at a nursery in Geelong and will get that when we have the house - we'll need to hire a ute or truck for that one and so we only want to move it once!
Here's our collection of plants so far - there are also a few that we bought a while back along with a couple that we've rescued from the bargain sections...
Monday, May 25, 2009
A hive of activity!
When I visited the house this morning it was a hive of activity.
The tilers were there doing the bathroom tiles and finishing the kitchen wall tiles. The floor tiles in the ensuite, bathroom, laundry, entry, kitchen, dining and living room are all complete (minus the grout).
The painter was back - doesn't look like he was there at all last week.
and...
The heating guys were installing our central heating.
There's still quite a bit to go...
- Finish tiling
- Finish painting
- Finish heating installation
- Brick clean
- downpipes
- shower screens and mirrors
- plumbing fit-off
- electrical fit-off
- robe doors and shelving
- door knobs
- garage door
- carpets
- driveway
- ceiling insulation
- house clean and site clean
I didn't get to meet with the SS when I was there this morning (mix up with appointment times) so I have no idea what the latest prediction for completion is. Given all that is left to do I tend to think that we are still at least 4 weeks from completion - I happy to be proven wrong on this though.
So now for the bit that you've been waiting for - pictures!!
Entry tiles - they're filthy from all the muddy workboots traipsing in...
Living room
Close up of the ensuite feature tile
Inside kitchen cupboards - just 'cause!
Kitchen floor
Kitchen tiling - we're not sure what's happening here... there's a section to the left of the window that's not done but we've checked the plans and it's certainly supposed to be done. I didn't really notice until I was looking through the photos so didn't ask the tilers about it (doh!)
Bathroom shower feature
Ensuite